Hello, welcome to Liaoning Lvyuan Energy Environmental Protection Technology Group Co., Ltd!
语言选择: ∷ 
2017
 
Lvyuan Boiler Co., Ltd. was recommended as the 2017 Liaoning science and Technology Award project.
 
The electromagnetic heating boiler independently developed, manufactured and installed by our company has been successfully operated in
 Jingzhong Street Primary School and Dongcheng activity class center in Dongcheng District, Beijing, marking that Lvyuan group has
 contributed an important force to the national "coal to electricity" strategy and Beijing's "haze" project.
2016
 
Beijing Huaneng 6x116mw gas super clean emission heat supply unit project started. As the first domestic super clean emission unit 
manufacturing enterprise, Lvyuan group is determined to build a world-class performance with first-class standards, and make a good
 turnaround for Liaoning manufacturing industry and a good start for Liaoning green manufacturing leader in the world!
Lvyuan group and Liaoning University carried out university enterprise connection, established Lvyuan energy and Environmental Science 
Design Institute of Liaoning University, carried out theoretical research and application technology exploration in energy conservation, materials, .
automatic control, environmental protection and other aspects, and promoted the development of environmental protection industry
The coal-fired boiler series products of Lvyuan group are selected into the recommended catalogue of energy-saving mechanical and electrical equipment (products) (the Seventh Batch).
 
 
Lvyuan boiler won the first prize of Yingkou science and technology progress award.
 
2015
 
Three domestic gas-fired hot water boilers with the largest capacity manufactured by our company have been manufactured and sent to Xi'an.
 
 
Three domestic gas-fired hot water boilers with the largest capacity manufactured by our company have been manufactured and sent to Xi'an. No. 201 (25) document of Liaoning 
provincial government specifies that our company is listed as the first choice enterprise in the field of energy conservation and environmental protection to strengthen the emerging 
strategic industry of Liaoning Province.
The 4 × 58MW coal-fired boiler heating system contracted by EPCM (design, manufacturing, installation and operation management) of Liaoning Lvyuan Group signed a contract 
on July 17, completed the system design on August 30, started construction on September 9, officially started heating operation on November 15 and put into operation on December 30.
 
 
2012
 
The first fourth generation of high efficiency and environmental protection angle tube hot water boiler in China has been successfully developed, and its thermal efficiency is expected to reach 86%.
 
2010
 
The company's first 91mw improved third generation corner tube hot water boiler has been successfully developed and obtained a patent for invention. Its products are used in Xinjiang Tacheng 
Runsheng thermal power company.
2009
 
The company has designed and manufactured the first shw64mw large reciprocating hot water boiler in China, which is used in Hunnan thermal power company of Shenyang City.
 
2008
 
The products are selected into Dalian Hongyanhe Nuclear Power Station.
 
2007
 
The first qxl70mw boiler of the company was put into operation in Shenyang Dongtai thermal power company, and the manufacturing chapter of large capacity boiler began.
 
The company has obtained A-class boiler manufacturing license.
 
2001
 
The company was transformed into a private limited liability company.
 
Complete GEF project technology introduction, demonstration boiler house and briquette machine project.
 
2000
 
The enterprise merges Yingkou crane General Factory, Yingkou mechanical and electrical factory.
 
Wen Shizhen, Secretary of the provincial Party committee, led leaders of provinces and cities such as Lu Xin and Xu Weiguo, vice governors, to inspect the company on August 3.
 
1999
 
The implementation of private management of state-owned enterprises and the annual salary system of enterprise managers has opened the curtain of enterprise reform.
 
1998
 
 
Relying on its advantages in technology development, the company stands out among more than 400 boiler plants in China and has been 
selected into the GEF China high efficiency industrial boiler project, becoming one of the nine selected enterprises
(the remaining eight are Hagong boiler, Jinan Boiler Plant, Jiangxi boiler plant, Zhengzhou boiler plant, Hangzhou Boiler Plant, Changzhou boiler plant, Tianshan boiler plant and Shanghai Sifang boiler plant).
1995
 
Three shl29mw hot water boilers are provided for the Centennial project of Peking University.
 
 
Three finalized dzl29mw hot water boilers have been put into operation in Beijing Huajiadi heat supply plant, and the crossbeam grate is used for the first time in China.
 
 
President Jiang Zemin inspected our products.
 
 
1993
 
Water fire tube shell boiler technology has been listed in the national Torch Program promotion project.
 
 
The first dzl29mw boiler was put into operation in Beijing Anzhen Xili heat supply plant.
 
1990
 
The first dzl7.0mw hot water boiler is installed in weixiuyuan, Peking University. After ten years of operation, the output and efficiency of the boiler remain unchanged.
It has opened the history of new water fire tube shell boiler.
 

辽宁绿源能源环保科技集团有限公司Sweep WeChat yards pay attention to us

  • 24-hour hotline04173318821

  • The mobile phone13898749343

Copyright © 2002-2020 Liaoning Lvyuan Energy Environmental Protection Technology Group Co., Ltd. All Rights Reserved Address:121 Xinlian street, Yingkou District, China (Liaoning) pilot Free Trade Zone ICP:">辽ICP备1901697-1